Project Management

Riverlake succesfuly engineered a terminal expansion

01/05/2021

Riverlake is proud to have been instrumental in coordinating and supervising the engineering part of this development together with you all. Chris Kruger has been the project manager at Riverlake.

Rubis Terminal Rotterdam is ready to operate 15 brand new stainless steel tanks with a total capacity of 31.500 m3 (6 x 3.000 m3 and 9 x 1.500 m3) in June 2020! The tanks are designed to be used for a large variety of chemical products.

See our video from January 2020 for the placement of the 6 x 3000 m3 tanks!

https://vimeo.com/396736274